Job done in September-October 2022
Various jobs took place pre-dry-dock, during dry-dock and post dry-dock with over 80 man-power onboard with jobs like:
- Grey-water tank plate and reinforcement replacement
- Sewage transfer pipe line replacement
- Sewage air vent pipes replacement
- Grey-water tank replacement
- Structural ventilation duct on mooring station repairs
- Balcony drain pipe replacement
- Ship’s name removal
- Bridge window wipers replacement
- Hot potable water pipe replacement.